点评:Dhermi
Brace yourself for a massive construction site. The scale of redevelopment here is colossal. As of May 2026, almost nothing is complete with explanations that stalled projects result from Russia’s war in Ukraine deterring clients from those formerly significant markets to legal wrangles and construction disputes and delays. The beach front boulevard is a diabolical mess of empty concrete shells, rebar, construction waste, unpacked shop fittings, air conditioning units, scaffolding, insulation material, electrical and plumbing junk and demolished old beach front structures. There are almost no people including very few signs of ongoing construction activity. Local business owners are depressed and struggling. At best it looks like a once proud massive project gone horribly wrong. It could take years to get this place up to a standard where anyone would be comfortable staying here.
翻译:德尔米
做好心理准备,这里将变成一个巨大的建筑工地。重建规模极其庞大。截至2026年5月,几乎所有工程都尚未完工,项目停滞的原因包括:俄罗斯在乌克兰的战争导致客户流失,这些曾经重要的市场如今却空空如也;以及由此引发的法律纠纷、施工纠纷和延误。海滨大道一片狼藉,到处是空荡荡的混凝土结构、钢筋、建筑垃圾、未拆封的店铺设备、空调机组、脚手架、保温材料、废弃的电气和管道设施,以及被拆除的旧海滨建筑。这里几乎空无一人,也几乎看不到任何施工迹象。当地商户生意惨淡,举步维艰。往好了说,这里曾经是一个令人自豪的大型项目,如今却彻底失败了。或许需要数年时间,才能让这里达到人们可以安心居住的标准。